There's a lot to like here.
The Board is pleased to advise that the M Sand was successfully perforated and placed on production. The well is
presently cleaning up with initial flow rates of 160 BOPD, 1,150 MCFD and 16 BSWPD from a 9/64 inch choke. All
production is going directly into the existing facilities and will be sold.
Choke barely open and all production is plumbed directly into facilities and WILL BE SOLD.
BRING IT ON GGP.