And once panel 2 is fully commissioned the syngas produced will then allow for the commissioning of gas engines at 5 mw power station. All things going well.Moving forward!
ASX Market Open: Aussie stocks to open flat after a volatile night on Wall Street ahead of US jobs report | September 6, 2024