GGE 0.00% 0.6¢ grand gulf energy limited

The Dugas & Leblanc #3 well spudded on 16 April 2011 and reached...

  1. 492 Posts.
    The Dugas & Leblanc #3 well spudded on 16 April 2011 and reached TVD of 8,000ft (TD 8,920ft) on
    Saturday, 30 April 2011. The well encountered gas shows through all primary intervals whilst drilling and a
    further show was identified in a potential new ?S? sand structure.

    The Board is pleased to advise that casing was successfully run to the bottom of the ?S? sand at a TD of
    8,503 ft. The casing was cemented and evaluation logs will be run in the next 24 hrs. A testing program is
    due to commence within a week utilising a 24hr completion rig. Due to the proximity of the well to thethe well to the
    currently producing D&L#2, the well can be put on production in a very short period of time.
 
watchlist Created with Sketch. Add GGE (ASX) to my watchlist
(20min delay)
Last
0.6¢
Change
0.000(0.00%)
Mkt cap ! $11.52M
Open High Low Value Volume
0.6¢ 0.6¢ 0.6¢ $12.77K 2.323M

Buyers (Bids)

No. Vol. Price($)
8 7518972 0.5¢
 

Sellers (Offers)

Price($) Vol. No.
0.6¢ 730188 5
View Market Depth
Last trade - 15.48pm 28/06/2024 (20 minute delay) ?
GGE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.