SLR silver lake resources limited

Fire was a minor setback, but this could be a big game changer...

  1. 1,578 Posts.
    lightbulb Created with Sketch. 234

    Fire was a minor setback, but this could be a big game changer for SLR, all the dots getting into place, waiting on exploration updates ..........................

    Sugar Zone – Operational reset to leverage installed infrastructure ▪ Mining reset through investment & approach- Introduction of latest generation drilling and loading fleet on track fordelivery and commissioning through Q4 FY23 & Q1 FY24

    • Supports mine redesign to incorporate increased level intervals,improved operating efficiency and lower costs- New fit for purpose maintenance workshop operational, upgrades tomining services infrastructure (pumping, communications) welladvanced- Deliver acceptable availabilities and utilisation of fleet, followed byoptimising productivity

    ▪ Plant optimisation to provide flexibility- New crusher removes high cost bottleneck & increases throughputfrom 40t/hr to >100t/hr- Paste plant and reticulation system to deliver paste underground‒ Increased ore recovery, improved stope stability & reduced LOM TSFfootprint with the majority of tailings deposited underground

    https://hotcopper.com.au/data/attachments/5427/5427593-b7ab0d8fa146205f29816fed903a3117.jpg

 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.