This must be a first for the JV with the SL1 frac team and the rig for Kennedy H1 arriving on schedule. We must conclude that the delay games are over, all possible available leases have been secured and they are keen to prove what thay have for us.
Hope that EME will release test info on Kunde 3 in conjunction with SL1 test results for maximum impact.
This must be a first for the JV with the SL1 frac team and the...
Add to My Watchlist
What is My Watchlist?