Imagine this crazy hyperthetical at the Equador project (Brazil), assuming:
*Strike length 5,000 metres x width of 1,000 metre x 100 metre depth.
*That would equate to 500 million cubic metres of host material.
*If 0.1 % Tantalum, then that would be approx. 500,000 cubic metres of Tantalum.
*Therefore, 500,000 x $6-8 million AUD per cubic metre = Approx $3-4 Trillion AUD.
I would be happy with that!
All the best!
MicroNova2035
IMHO / DYOR
- Forums
- ASX - By Stock
- SUM Chart
Imagine this crazy hyperthetical at the Equador project...
-
-
- There are more pages in this discussion • 308 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
Add SUM (ASX) to my watchlist
(20min delay)
|
|||||
Last
24.0¢ |
Change
0.010(4.35%) |
Mkt cap ! $20.23M |
Open | High | Low | Value | Volume |
21.5¢ | 25.0¢ | 21.5¢ | $57.65K | 247.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 5000 | 23.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
25.0¢ | 5829 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 5000 | 0.235 |
3 | 64766 | 0.230 |
1 | 6293 | 0.225 |
1 | 10000 | 0.220 |
2 | 16844 | 0.215 |
Price($) | Vol. | No. |
---|---|---|
0.250 | 5829 | 1 |
0.255 | 110819 | 2 |
0.260 | 159211 | 4 |
0.270 | 117738 | 3 |
0.275 | 145000 | 3 |
Last trade - 14.26pm 04/10/2024 (20 minute delay) ? |
Featured News
SUM (ASX) Chart |