SUM 0.00% 17.5¢ summit minerals limited

Imagine this crazy hyperthetical at the Equador project...

  1. 420 Posts.
    lightbulb Created with Sketch. 157
    Imagine this crazy hyperthetical at the Equador project (Brazil), assuming:

    *Strike length 5,000 metres x width of 1,000 metre x 100 metre depth.
    *That would equate to 500 million cubic metres of host material.
    *If 0.1 % Tantalum, then that would be approx. 500,000 cubic metres of Tantalum.
    *Therefore, 500,000 x $6-8 million AUD per cubic metre = Approx $3-4 Trillion AUD.

    I would be happy with that!

    All the best!

    MicroNova2035

    IMHO / DYOR
    Last edited by MicroNova2035: 28/08/24
 
watchlist Created with Sketch. Add SUM (ASX) to my watchlist
(20min delay)
Last
17.5¢
Change
0.000(0.00%)
Mkt cap ! $15.10M
Open High Low Value Volume
17.5¢ 18.0¢ 17.5¢ $14.13K 80.07K

Buyers (Bids)

No. Vol. Price($)
1 3574 17.0¢
 

Sellers (Offers)

Price($) Vol. No.
17.5¢ 31098 1
View Market Depth
Last trade - 16.10pm 08/11/2024 (20 minute delay) ?
SUM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.