Imagine this crazy hyperthetical at the Equador project (Brazil), assuming:
*Strike length 5,000 metres x width of 1,000 metre x 100 metre depth.
*That would equate to 500 million cubic metres of host material.
*If 0.1 % Tantalum, then that would be approx. 500,000 cubic metres of Tantalum.
*Therefore, 500,000 x $6-8 million AUD per cubic metre = Approx $3-4 Trillion AUD.
I would be happy with that!
All the best!
MicroNova2035
IMHO / DYOR
- Forums
- ASX - By Stock
- SUM Chart
Imagine this crazy hyperthetical at the Equador project...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SUM (ASX) to my watchlist
(20min delay)
|
|||||
Last
17.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $15.10M |
Open | High | Low | Value | Volume |
17.5¢ | 18.0¢ | 17.5¢ | $14.13K | 80.07K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 3574 | 17.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
17.5¢ | 31098 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 3574 | 0.170 |
1 | 50000 | 0.165 |
3 | 235361 | 0.160 |
2 | 20500 | 0.155 |
7 | 135215 | 0.150 |
Price($) | Vol. | No. |
---|---|---|
0.180 | 180000 | 3 |
0.185 | 10000 | 1 |
0.190 | 55000 | 1 |
0.195 | 150762 | 2 |
0.200 | 26990 | 1 |
Last trade - 16.10pm 08/11/2024 (20 minute delay) ? |
Featured News
SUM (ASX) Chart |
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online