Longstory, i did some maths on breakeven for Sunrise once in production vs PEP
PEP estimated $24000 per tonne Nickel + sulphate
PEP estimated $59000 per tonne cobalt
Based on above, the estimate was USD-0.8c per pound cash operating costs because of the significant COBALT credits in production, estimate of cost before credits was US$4.58 per pound. Cobalt credit was 1.97 equivalent.
At current pricing we have 83% of PEP nickel estimate and 50% of PEP cobalt estimate.
So current cash costs nickel (no COBALT credit) = $5.5 per pound
With 50% cobalt credit = $1 per pound
So current cash operating costs = US$4.5 per pound versus current US$ Nickel price of $7 per pound. Still netting US$ 2.5 per pound.
This is without PGM and Scandium credits included and still cost competitive with Indonesian Nickel.
Cost of production will be key in this operating environment and a key consideration for investment
- Forums
- ASX - By Stock
- SRL
- Sunrise 2024
Sunrise 2024, page-79
- There are more pages in this discussion • 18 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SRL (ASX) to my watchlist
(20min delay)
|
|||||
Last
59.0¢ |
Change
0.015(2.61%) |
Mkt cap ! $53.23M |
Open | High | Low | Value | Volume |
57.5¢ | 59.5¢ | 56.5¢ | $7.984K | 13.93K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 4915 | 56.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
59.5¢ | 1000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 4915 | 0.565 |
2 | 3237 | 0.550 |
2 | 3741 | 0.545 |
1 | 20000 | 0.540 |
2 | 12848 | 0.525 |
Price($) | Vol. | No. |
---|---|---|
0.600 | 16847 | 4 |
0.610 | 2503 | 2 |
0.620 | 15000 | 1 |
0.630 | 5035 | 1 |
0.650 | 630 | 1 |
Last trade - 16.10pm 24/05/2024 (20 minute delay) ? |
|
|||||
Last
57.0¢ |
  |
Change
0.015 ( 2.56 %) |
|||
Open | High | Low | Volume | ||
59.5¢ | 59.5¢ | 56.5¢ | 3466 | ||
Last updated 15.56pm 24/05/2024 ? |
Featured News
SRL (ASX) Chart |