@mir911 idk. My guess is we will find out in due course when the revised policy is in place, the dust settles and memories have faded. It beggars belief that they would be drilling a string of $25M duds/dusters LK2, LK3 and LK4(planned), given they had the benefit of 3D seismic and some well control...Theyre currently drilling LK5, step out to NED-1. LK4 is next and theres also another pad adjacent to NED-1...someone said they damaged the hole in NED-1...or maybe it is a separate hole to test the 100m oil column in the wagina...
- Forums
- ASX - By Stock
- Support for domgas review
Theyre currently drilling LK5, step out to NED-1. LK4 is next...
- There are more pages in this discussion • 223 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STX (ASX) to my watchlist
(20min delay)
|
|||||
Last
20.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $572.4M |
Open | High | Low | Value | Volume |
20.0¢ | 20.3¢ | 19.5¢ | $1.489M | 7.464M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
32 | 1135945 | 19.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
20.0¢ | 40340 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
31 | 1115945 | 0.195 |
28 | 1479925 | 0.190 |
17 | 728180 | 0.185 |
18 | 620637 | 0.180 |
10 | 537857 | 0.175 |
Price($) | Vol. | No. |
---|---|---|
0.200 | 40340 | 1 |
0.205 | 916606 | 8 |
0.210 | 1011092 | 8 |
0.215 | 920568 | 12 |
0.220 | 1102913 | 13 |
Last trade - 16.10pm 26/04/2024 (20 minute delay) ? |
|
|||||
Last
19.8¢ |
  |
Change
0.000 ( 1.99 %) |
|||
Open | High | Low | Volume | ||
19.8¢ | 20.0¢ | 19.8¢ | 3981429 | ||
Last updated 15.59pm 26/04/2024 ? |
Featured News
STX (ASX) Chart |