STX 0.00% 17.0¢ strike energy limited

My take is that Phase 1 of SE development is already contracted...

  1. 618
    3,336 Posts.
    lightbulb Created with Sketch. 2293
    My take is that Phase 1 of SE development is already contracted and FID will likely proceed once SE2 and SE3 are flow tested to confirm productivity. Due to the modular design of our processing plant, STX has the flexibility to sanction additional modules if the export ban is lifted

    618
 
watchlist Created with Sketch. Add STX (ASX) to my watchlist
(20min delay)
Last
17.0¢
Change
0.000(0.00%)
Mkt cap ! $487.1M
Open High Low Value Volume
16.5¢ 17.0¢ 16.0¢ $1.708M 10.27M

Buyers (Bids)

No. Vol. Price($)
11 929388 16.5¢
 

Sellers (Offers)

Price($) Vol. No.
17.0¢ 1165570 9
View Market Depth
Last trade - 16.10pm 23/08/2024 (20 minute delay) ?
STX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.