STX 0.00% 22.0¢ strike energy limited

Theyre currently drilling LK5, step out to NED-1. LK4 is next...

  1. 2,935 Posts.
    lightbulb Created with Sketch. 5494
    @mir911 idk. My guess is we will find out in due course when the revised policy is in place, the dust settles and memories have faded. It beggars belief that they would be drilling a string of $25M duds/dusters LK2, LK3 and LK4(planned), given they had the benefit of 3D seismic and some well control...



    Theyre currently drilling LK5, step out to NED-1. LK4 is next and theres also another pad adjacent to NED-1...someone said they damaged the hole in NED-1...or maybe it is a separate hole to test the 100m oil column in the wagina...

    https://hotcopper.com.au/data/attachments/5913/5913226-4fd037a72b494bd4317e2576ef9d3772.jpg



 
watchlist Created with Sketch. Add STX (ASX) to my watchlist
(20min delay)
Last
22.0¢
Change
0.000(0.00%)
Mkt cap ! $629.3M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
2 51000 23.0¢
 

Sellers (Offers)

Price($) Vol. No.
22.0¢ 34949 5
View Market Depth
Last trade - 09.30am 29/05/2024 (20 minute delay) ?
STX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.