CVN 0.00% 16.5¢ carnarvon energy limited

Support vessels, page-9

  1. 747 Posts.
    lightbulb Created with Sketch. 115
    Magpie: It would depend what speed can be achieved. The sea distance from Keppel's yard to Pt Hedland is 1678 nm. The Ensco 107 specifications gives a transit speed of 4.5-5knots. so at 4.5knots it would take 15 days and 13 hours. However, I don't know how much faster, if at all, a heavy load carrier would take with the rig on board Cheers..
 
watchlist Created with Sketch. Add CVN (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.