CTP 3.64% 5.3¢ central petroleum limited

Don't they need the rig to conduct EPT since they have not...

  1. 11,076 Posts.
    lightbulb Created with Sketch. 3730
    Don't they need the rig to conduct EPT since they have not installed the coiled tubing into the barefoot completion portion of horizontal.

    Would have thought that is a risk not worth taking to proceed without protecting our hole (so to speak).

    Did I miss something?
 
watchlist Created with Sketch. Add CTP (ASX) to my watchlist
(20min delay)
Last
5.3¢
Change
-0.002(3.64%)
Mkt cap ! $40.24M
Open High Low Value Volume
5.5¢ 5.5¢ 5.3¢ $83.24K 1.515M

Buyers (Bids)

No. Vol. Price($)
3 257655 5.3¢
 

Sellers (Offers)

Price($) Vol. No.
5.4¢ 68 1
View Market Depth
Last trade - 14.15pm 15/11/2024 (20 minute delay) ?
CTP (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.