29 October 2013 Interim Management statement DRAGON OIL - just out....
"Sidetrack-2 can be drilled in the Abiod formation from the original Hammamet West-3 wellbore to intersect fractures identified previously and to reach the originally targeted fracture zone. Previously employed GSP drilling rig is to be released and an alternative rig is expected to be secured to drill Sidetrack-2 in the NEAR FUTURE."
Not to sure what near future means but I hope Dragon mean ver soon! I hope they had something in mind with this statement. Im sure that Dragon will be taking a more active roll with HW3 ST2.
- Forums
- ASX - By Stock
- JKA
- suspension time frame...?
suspension time frame...?, page-29
-
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)