Profesional Geos..got to trust them. I predict a very large deposit..not as high as Sara Res grades but very easy to mine @ low cost as some other posts said $350 ton underground mining $30 ton open cut from 10m below surface ..with very low cost of start up mining I would think Drakes deposit will turn out to be much moore profitable.DOR