RDM 1.85% 13.8¢ red metal limited

Correction to my previous post - ARU did update their Nolans...

  1. 270 Posts.
    lightbulb Created with Sketch. 1018
    Correction to my previous post - ARU did update their Nolans economics in 2022. Their early 2022 estimated CAPEX (before ILU/LYC demonstrated blow outs and 2022-24 inflation) was $1.6B AUD to produce 4,440 tpa NdPr oxide. OPEX on an NdPr oxide produced basis was 29 USD/kg after phosphoric acid credits (very good). But the incredibly high up front CAPEX means a LOM average NdPr oxide price of 130 USD/kg is required to get to 20% IRR, or nearly 3x the current spot price.

    https://hotcopper.com.au/data/attachments/6031/6031683-7b383cd04976c2a69183ed2cbf71ed6b.jpg

    Would be interesting to do a head to head comparison with Sybella after follow up met work is released.
 
watchlist Created with Sketch. Add RDM (ASX) to my watchlist
(20min delay)
Last
13.8¢
Change
0.003(1.85%)
Mkt cap ! $41.95M
Open High Low Value Volume
14.0¢ 14.0¢ 13.8¢ $314 2.242K

Buyers (Bids)

No. Vol. Price($)
6 6971 13.5¢
 

Sellers (Offers)

Price($) Vol. No.
14.0¢ 37021 2
View Market Depth
Last trade - 12.17pm 08/08/2024 (20 minute delay) ?
RDM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.