RDM 4.55% 11.5¢ red metal limited

Soft rock is 200-300Mt (first 20-30m from surface), hard rock...

  1. 8,383 Posts.
    lightbulb Created with Sketch. 2752
    Soft rock is 200-300Mt (first 20-30m from surface), hard rock goes easy 150m or more which would easy pit the mapped host granite into +1Bt and likely much much more.

    But for awesome economics and 10Mtpa for 15-20yrs RDM only need the soft rock resource.
 
watchlist Created with Sketch. Add RDM (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.