Bit more Billabong detail, SSN are in discussion with a service provider on the best approach to clear the plug and pipe. Coring is not possible but milling is an option (Both pipe and concrete) at the rates stated above if they can stay within and avoid the hardened collars on the pipe joints. Side tracking was not an option with rig-24 it would be easier to re drill the well from scratch.
Three forks 1st bench wells could be drilled east/west as 10,000ft laterals across the acreage as slawsons preferred option. so permits would need to be adjusted for this.
SSN Price at posting:
2.4¢ Sentiment: None Disclosure: Held