Bushboi;
A camp way to spell a rough and ready nic, anyway.
Fruitbowl/Breadbasket or Artesian/Aquifiers same diff. The point being that a company with 2.1b shares on issue at the start of this enormous project does not really fit the up up and away model does it.
Yes this is the spec end of the market and a tired company to boot. For a slightly comparable company with similar grades albeit different host rock, but still technically challenging take a look at HRR. It was once a speccie !
The rail referance was toungue in cheek too.
Yet to hear a credible answer yet to the water solution.
At these prices a 4:1 consolidation is unlikely to hurt either.
- Forums
- ASX - By Stock
- ta for jervois
Bushboi;A camp way to spell a rough and ready nic,...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add JRV (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.8¢ |
Change
0.002(12.5%) |
Mkt cap ! $51.35M |
Open | High | Low | Value | Volume |
1.6¢ | 1.9¢ | 1.6¢ | $73.23K | 4.195M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
12 | 1361130 | 1.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.8¢ | 105519 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
12 | 1361130 | 0.017 |
11 | 7335683 | 0.016 |
18 | 10315012 | 0.015 |
23 | 5751615 | 0.014 |
6 | 1893846 | 0.013 |
Price($) | Vol. | No. |
---|---|---|
0.018 | 105519 | 5 |
0.019 | 1089544 | 4 |
0.020 | 145001 | 3 |
0.021 | 897777 | 3 |
0.022 | 450000 | 2 |
Last trade - 14.57pm 01/07/2024 (20 minute delay) ? |
Featured News
JRV (ASX) Chart |
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, CEO
Charles Armstrong
CEO
SPONSORED BY The Market Online