nothing wrong with the capex. always saw the metcoal product and relatively low capex as the best points about the project.
though $145m on a $280m notional build now cok has 100% ownership leaves me wondering what you think makes up the shortfall - let alone the capex required for linking infradtructure and the gladstone port outlays
margin at curren 92us pci would notionally be -$10-15/tone npat i expect.
ie opex before royalties, admin and transports costs is probably aud 105-110
theyll be wanting the rba to cut rates asap to lower the aud
COK Price at posting:
0.3¢ Sentiment: None Disclosure: Held