Hi Froggy,
I have a small holding in CZL,
I was reading that in 2022 they expect that production of zinc will outstrip global demand, which is based on the forecast of new mines that are expected to come into production, it will be worthwhile keeping an eye on the zinc price and the lme stockpile.
With CZL having high grade zinc, will be a lower-cost producer,
Silver only makes up a small part of CZL revenue,
Septembers update - 3,607 DMT of ore processed, with processed grades of 10.4% Zinc, 7.5% Lead and 32 g/t Silver
Silver 3607T x 32g = 115k grams = approx 4000 oz x $17 = $68k
Zinc - 3607T x 10.4% = 375t x $2300 = $860k
Lead - 3607T x 0.075 = 270 x $2150 = $580k
This assumes 100% recoveries.
- Forums
- Lounge
- Takeovers Panel - Nido Petroleum
Hi Froggy, I have a small holding in CZL, I was reading that in...
-
- There are more pages in this discussion • 5,461 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)