The bricky is payed for bricks laid, why would he not use the the half? whether the labourer is doing cuts or the bricky is splitting with the trowel, ive never seen a bricky deliberately choose to leave a half if he already has one?
the only waste is in mortar where dags are cut off or washed out of the cavity.
I'd hate to see the labour involved in cleaning up the glue that was being thrown everywhere.
that's made to bond to concrete and dries in 40mins. imagine the clean up on the floor and walls after that last test.
.look a little deeper.
- Forums
- ASX - By Stock
- Talking Smack
The bricky is payed for bricks laid, why would he not use the...
- There are more pages in this discussion • 40 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FBR (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $111.0M |
Open | High | Low | Value | Volume |
2.5¢ | 2.6¢ | 2.5¢ | $19.04K | 755.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
9 | 1797438 | 2.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.5¢ | 2500000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
8 | 1796358 | 0.024 |
4 | 1143521 | 0.023 |
5 | 813225 | 0.022 |
9 | 1868815 | 0.021 |
15 | 2274346 | 0.020 |
Price($) | Vol. | No. |
---|---|---|
0.025 | 2500000 | 1 |
0.026 | 1899570 | 7 |
0.027 | 3501932 | 9 |
0.028 | 4017864 | 6 |
0.029 | 1185337 | 4 |
Last trade - 15.55pm 03/05/2024 (20 minute delay) ? |
|
|||||
Last
2.4¢ |
  |
Change
0.000 ( 7.69 %) |
|||
Open | High | Low | Volume | ||
2.5¢ | 2.6¢ | 2.4¢ | 707625 | ||
Last updated 15.53pm 03/05/2024 ? |
Featured News
FBR (ASX) Chart |