FBR 8.70% 2.5¢ fbr ltd

Talking Smack, page-26

  1. 914 Posts.
    lightbulb Created with Sketch. 438
    Thanks for posting that short video bugi. Look! Plans and specifications are designed by architects and engineers well before the site is cleared for construction. The plans get sent to frame and truss companies all via CAD. They are never wrong.
    I do forensic building reports on occasions. I can tell you right now by that video, the problem is with the step down on the slab is 100mm out and the wall frames, floor joists has not lined up, the wall frame has been shifted to compensate, out of plumb,floor joists are not reaching or too long and had to be modified on site by the carpenters. It puts the trusses out. it all comes down to poor site supervision at the setout,formwork and slab stage. The steel beam deflection in the video what I can see is absolutely normal, all beams deflect when loads are applied, there are calculations for the span to see if it is excessive.
    If you think these problems won't arise using the HX....You may be very surprised.
 
watchlist Created with Sketch. Add FBR (ASX) to my watchlist
(20min delay)
Last
2.5¢
Change
0.002(8.70%)
Mkt cap ! $111.0M
Open High Low Value Volume
2.4¢ 2.6¢ 2.4¢ $81.92K 3.316M

Buyers (Bids)

No. Vol. Price($)
1 41666 2.4¢
 

Sellers (Offers)

Price($) Vol. No.
2.5¢ 597015 3
View Market Depth
Last trade - 16.10pm 17/05/2024 (20 minute delay) ?
Last
2.4¢
  Change
0.002 ( 4.35 %)
Open High Low Volume
2.5¢ 2.6¢ 2.4¢ 2162230
Last updated 15.59pm 17/05/2024 ?
FBR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.