TPD 0.00% 21.0¢ talon energy ltd

Talon Today, page-59

  1. 426 Posts.
    lightbulb Created with Sketch. 39
    I am surprised it takes that long , usually a 1000 m well drill can take about 2-4 days, if coring maybe an extra day .
 
watchlist Created with Sketch. Add TPD (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.