From TAPs December Qtlys
In WA-33-R, the Maitland gas field was appraised during the quarter by drilling and testing the horizontal
sidetrack well Maitland-3H. Maitland-3H drilled a 500 metre horizontal section through the gas charged
reservoir and flowed at a stabilized rate of around 6 MMscf/d under restricted test conditions. The well was
then plugged and abandoned as scheduled. Studies are ongoing to determine the full flow potential, and
further drilling is anticipated in 2008.
From TAPs December QtlysIn WA-33-R, the Maitland gas field was...
Add to My Watchlist
What is My Watchlist?