Highlights include:-
The Company is pleased to report a 37% growth1 in JORC Reported Mineral Resources at the Stage II (Pedra Branca) Copper Project.- JORC Reported Mineral Resource Inventory for Stage I & II has increased to:
52.11Mt at 1.27% Copper, 0.32g/t Gold for 661,000 tonnes of contained Copper and 527,000oz of Gold- This equates to a Copper Equivalent2 of 773,000 tonnes of contained Copper at an average grade of 1.48% Copper Equivalent2, far exceeding the programme target.
- Stage II East grade is up by 10% and tonnes have increased by 50%, with mineralisation both thickening and remaining open at depth.
- Continued and substantial resource growth at Stage II is expected.
- True Widths of ore grade mineralisation reach and exceed 40m in new deep drilling in the East, which bodes well for the application of larger scale underground mining techniques.
- 49.05m at 1.60% Copper, 0.36g/t Gold from 522.00m APBD-12-16 Incl. 18.70m at 2.35% Copper, 0.93g/t Gold, from 561.45m
- 54.00m at 1.29% Copper, 0.32g/t Gold from 445.00m APBD-12-15 Incl. 24.70m at 2.00% Copper, 0.51g/t Gold, from 461.00m
- New intersection ABPD-12-18 is double the typical grades observed previously in the West, indicating potential that this zone could develop at depth similarly to the high grade East:
- 24.00m at 1.50% Copper, 0.50g/t Gold from 172.40m APBD-12-18 Incl. 9.80m at 2.41% Copper, 0.80g/t Gold, from 182.70m
- Drilling has commenced at the Conceicao Nickel-PGM project located in southern Carajas.
_______________________________________________- http://www.asx.com.au/asxpdf/20120927/pdf/428zlzgb5cc7ms.pdf
Add to My Watchlist
What is My Watchlist?