It is the perceived "cost" of that technology that has slowed broad take up.
That has changed with development firstly of far greater cost efficiency in NdFeb, and secondly, now emerging commercially specifically designed PMM to leverage the NdFeB.
As OEM's are embracing these developments the very last thing the industry needs is a rapid rise in underlying material input prices, however they very much do need to rise more in line with economic value to be sustainable.
- Forums
- ASX - By Stock
- Tariffs?...
It is the perceived "cost" of that technology that has slowed...
-
- There are more pages in this discussion • 22 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LYC (ASX) to my watchlist
(20min delay)
|
|||||
Last
$6.06 |
Change
0.140(2.36%) |
Mkt cap ! $5.664B |
Open | High | Low | Value | Volume |
$6.02 | $6.12 | $5.97 | $11.52M | 1.904M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 12791 | $6.04 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$6.07 | 13019 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 14538 | 6.000 |
2 | 134 | 5.960 |
1 | 100 | 5.920 |
2 | 10167 | 5.900 |
2 | 10033 | 5.890 |
Price($) | Vol. | No. |
---|---|---|
6.070 | 3000 | 1 |
6.100 | 7705 | 1 |
6.110 | 3000 | 1 |
6.120 | 7365 | 4 |
6.130 | 3000 | 1 |
Last trade - 16.10pm 09/08/2024 (20 minute delay) ? |
Featured News
LYC (ASX) Chart |