Thanks for the FHWA link, Plough.
This Georgia-based job with its requirement for precast, pre-stressed concrete girder bridge on precast, pre-stressed concrete piles and a high performance concrete deck..." would have been ideal for Eden's products. Sections of the project work are slated for 24 February to 3 March 2018.
https://flh.fhwa.dot.gov/projects/ga/pra-fopu/
When I randomly select works by State, many are for asphalt repairs. I wonder what proportion of total FHWA works require concrete repairs or new concrete works, including precast piles and girders.
- Forums
- ASX - By Stock
- TAS query by ASX
Thanks for the FHWA link, Plough. This Georgia-based job with...
-
- There are more pages in this discussion • 24 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EDE (ASX) to my watchlist
|
|||||
Last
0.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $7.427M |
Open | High | Low | Value | Volume |
0.2¢ | 0.2¢ | 0.2¢ | $20 | 10K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
71 | 193077450 | 0.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.2¢ | 8333137 | 11 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
71 | 193077450 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.002 | 8333137 | 11 |
0.003 | 45152691 | 28 |
0.004 | 8674367 | 6 |
0.007 | 50000 | 1 |
0.008 | 678361 | 1 |
Last trade - 14.17pm 24/07/2024 (20 minute delay) ? |
Featured News
EDE (ASX) Chart |
The Watchlist
1CG
ONE CLICK GROUP LIMITED
Mark Waller, MD
Mark Waller
MD
Previous Video
Next Video
SPONSORED BY The Market Online