The latest Alliance presentation is worth a read. 6.7% spod as a by-product on current plant set up for tantalum. 3rd stage metallurgy under way for optimized plant upgrade design. Engineers engaged. Quick start feasible and longest lead time 6 months.
- Forums
- ASX - By Stock
- TAW
- TAW - The Next Lithium Producer led by Mr Pegmatite
TAW - The Next Lithium Producer led by Mr Pegmatite, page-39
-
-
- There are more pages in this discussion • 2,662 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
NEWS
Antler Copper Project hits major permitting milestone – air quality permit advances to final review
NEWS
Breakthrough programs slash healthcare events, driving a significant A$1.8M+ annual revenue boost