POS 0.00% 0.4¢ poseidon nickel limited

TBC ROLL CALL (Mandatory Confirmations Required), page-74

  1. 13,234 Posts.
    lightbulb Created with Sketch. 555
    That road has been there from start. Dewatering of Black Swan Open pit started in early 2020 as soon as Peter Harold took over as MD. Those Pictures are around 6 months old.
    ..
    Water from open pit is taken back to Dam near water treatment plant (West end of the plant, you can see piping and floating pumps) and probably reused for various purpose. I believe there is no water now in open pit (except fresh rain water as happens time to time). I reconfirmed that last night by filtering through Dozens of Google Earth pictures as taken time to time.
    ..
    Happy to take any number President ZB gives. I am not fussy. I am old never not to worry minor issue. Toddlers fight for numbers, grown up shows leadership.

 
watchlist Created with Sketch. Add POS (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
0.000(0.00%)
Mkt cap ! $14.85M
Open High Low Value Volume
0.4¢ 0.5¢ 0.4¢ $44.42K 10.96M

Buyers (Bids)

No. Vol. Price($)
76 35438671 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 11634354 27
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
POS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.