MEO 0.00% 0.0¢ meo australia limited

td over weekend, page-45

  1. 206 Posts.
    Spawk,

    Pulling an unscheduled logging job is only warranted in following scenarios:

    1. theyve drilled past a zone with indications of hydrocarbons and the zone will be cased off when they get to Well TD
    2. Decision on drilling further cant be made without wireline data.

    Im not intimately familiar with Zeus-1 but from what I do know if they didnt get shows in secondary target then theres no justification to pull an unplanned wireline job. I imagine the logging crews are probably on board by now as they take a few days to do tool checks etc.

    Cheers
 
watchlist Created with Sketch. Add MEO (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.