TEG 6.25% 1.5¢ triangle energy (global) limited

TEG 2024 hopes and dreams, page-4

  1. 851 Posts.
    lightbulb Created with Sketch. 198
    Happy new years lads

    I've had a look but might have missed it - any word on when and what rig we're drilling with this year? I've seen long lead time items have been ordered

    I've read the EPs for Becos and Booth which give a rough timeline. The first screenshot below is for Becos, second is for Booth. Basically we're at the point where the project should be kicking off now (or very soon) and there hasn't been much news on whats happening.

    https://hotcopper.com.au/data/attachments/5857/5857167-70a920dde800812f34e2633aff0bc12f.jpg

    2
    https://hotcopper.com.au/data/attachments/5857/5857110-7a45a291ef6b4ad28019844b69228854.jpg

    Side note for Triangle. It would be nice if you could format documents that you submit in the same way. Looking between 2 documents with different document layouts, GPS formats and text fonts for roughly the same information is silly.

 
watchlist Created with Sketch. Add TEG (ASX) to my watchlist
(20min delay)
Last
1.5¢
Change
-0.001(6.25%)
Mkt cap ! $27.20M
Open High Low Value Volume
1.5¢ 1.5¢ 1.4¢ $453.8K 30.36M

Buyers (Bids)

No. Vol. Price($)
25 34962717 1.4¢
 

Sellers (Offers)

Price($) Vol. No.
1.5¢ 2619 1
View Market Depth
Last trade - 16.10pm 05/08/2024 (20 minute delay) ?
TEG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.