JMS 4.65% 20.5¢ jupiter mines limited.

tenement positions for consolidation, page-10

  1. s8
    7,757 Posts.
    Here is more info re infrastructure.


    General - Area

    The Central Yilgarn Iron project comprises three ELAs being E29/560 Mt Ida, E29/581 Mt Alfred and E30/296 Mt Hope, collectively covering approximately 460km2. Banded Iron Formation (BIF) strike-length is significant within each of the tenements. Results of previous surface sampling at Mt Ida include economic grades of hematite and goethite iron ore with supporting low phosphorus. The tenements are located in a region with good infrastructure and existing iron ore production from the Koolyanobbing operations of Portman Ltd.

    Access to each of the tenements is good with sealed and formed gravel roads directly linking the regional centre of Kalgoorlie with each project area. A spur line at nearby Menzies provides a rail link to deepwater port facilities at Esperance.



    http://www.rrrplc.com/english/2.htm



 
watchlist Created with Sketch. Add JMS (ASX) to my watchlist
(20min delay)
Last
20.5¢
Change
-0.010(4.65%)
Mkt cap ! $401.9M
Open High Low Value Volume
21.0¢ 21.5¢ 20.5¢ $315.8K 1.513M

Buyers (Bids)

No. Vol. Price($)
5 439766 20.5¢
 

Sellers (Offers)

Price($) Vol. No.
21.0¢ 271008 4
View Market Depth
Last trade - 16.10pm 23/08/2024 (20 minute delay) ?
JMS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.