TFE territory iron limited

hi guys..first offical post with code...(tfe) Territory Iron is...

  1. 37,286 Posts.
    lightbulb Created with Sketch. 400
    hi guys..

    first offical post with code...

    (tfe) Territory Iron

    is up and running.

    opened at a premium......

    keep a close eye on it..

    possible uranium connection as well..

    comments welcomed from people with mining experience

    (TFE) is a minerals exploration company with four main projects
    in the Northern Territory, with varying degrees of prospectability. These are
    the Frances Creek, Rum Jungle, Mt Bundey and Warrego projects.

    FRANCES CREEK PROJECT: located about 200 km south of Darwin and 20 km from the
    Alice Springs to Darwin railway, this project is considered to be of good to
    excellent prospectivity for iron mineralisation. The Inferred Mineral Resource
    estimate is 3 416 000 tonnes at 61.5% Fe.

    RUM JUNGLE PROJECT: located about 100 km south of Darwin within 25 km of the
    Alice Springs to Darwin railway, the project contains exploration targets of
    iron mineralisation, including a higher grade component at Yarram, and a number
    of iron outcrops within a geological setting considered prospective for the
    discovery of further iron mineralisation. A southwest dipping Lower Proterozoic
    sedimentary sequence underlies the area with three hematite lodes known in the
    east and one in the north with both probably extending a considerable distance
    in a westerly direction. Iron contents of the lodes range up to 63.4%.

    MT BUNDEY PROJECT: is located about 100 km southeast of Darwin adjacent to the
    Arnhem Highway. Haematite has been mined previously from the Mt Bundey area. The
    Company proposes to undertake an exploration program on the tenements in order
    to test a number of aeromagnetic anomalies with potential for Mt Bundey style
    iron ore. The tenements surround the old Mount Bundey martite and magnetite
    skarn iron deposit that was mined during 1968 to 1971 for some 843 000 tonnes of
    production at a grade of 63.43% iron, 0.057% phosphorus and 0.108% sulphur.

    WARREGO PROJECT: located about 50 km northwest of Tennant Creek and about 800 km
    south of Darwin, the project contains in the order of 10 million tonnes of
    tailings from past gold mining activities. The Company plans to undertake
    further studies to determine the viability of re-treating the tailings to
    produce a marketable magnetite product. Preliminary mineral processing testwork
    on samples of four of the tailings dam materials

    overall produced a 62.3% iron concentrate at a recovery of around 71% of the
    contained iron.


 
watchlist Created with Sketch. Add TFE (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.