textbook pullback = time to top up!, page-3

  1. 15,766 Posts.
    lightbulb Created with Sketch. 4817
    Great way to start the quarterly off (for those wondering if ABU was serious about moving to production);

    "During the Quarter ABM started the process of installing additional infrastructure at the Twin Bonanza Gold
    Camp which will be used for both the exploration phase and for the transfer to the potential mining operation.
    Kitchen and mess facilities, shower and ablution blocks as well as a Reverse Osmosis Plant for water
    purification were installed on site. During the Quarter the Company commissioned a 1.8 kilometre long
    airstrip, which will support current exploration and potential future mining activities. In addition, the access road
    to the Twin Bonanza Project has been repaired, graded and sheeted.

    The Company has contracted EcOz Pty Ltd of Darwin to guide the process from Exploration License to
    Mineral Lease. EcOz has completed further environmental surveys and is preparing documentation for the
    lodgement of a mining lease application for Old Pirate.

    During the Quarter ABM also lodged an application for the extraction of a 10,000 tonne bulk sample from the
    Old Pirate and the Golden Hind Deposits. The purpose of the bulk sample is to reconcile gold grade and
    recovery. Further details will be released following the grant of the authorisation. It is intended to complete the
    bulk sample under the conditions of the Exploration License.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
0.2¢
Change
-0.001(33.3%)
Mkt cap ! $6.350M
Open High Low Value Volume
0.3¢ 0.3¢ 0.2¢ $4.72K 2.259M

Buyers (Bids)

No. Vol. Price($)
11 20577442 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 77460764 36
View Market Depth
Last trade - 15.32pm 04/07/2025 (20 minute delay) ?
PRX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.