Thaduna Exploration Update
"Sipa is pleased to announce that we have secured a drill rig for November, to follow-up recent, very encouraging, results from the Enigma Prospect at our 100%-owned Thaduna Copper Project, in Western Australia’s Gascoyne Region.
A Reverse Circulation (RC) drill rig is booked to arrive at Thaduna around the middle of November, following a Heritage Survey at the Enigma Prospect, and surrounds.
The RC drilling, which will last for about one month before the drillers Christmas break, is designed to:
? define the lateral extent of the secondary copper
? determine the thickness of the secondary copper
? gain an understanding of the primary sulphides and host rocks in
fresh rock, by holes as deep as 300 metres, in order to:
? discover the primary, sulphide source of the secondary mineralisation
- Forums
- ASX - By Stock
- SRI
- thaduna update
thaduna update, page-2
-
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add SRI (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $3.650M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 289 | 1.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.7¢ | 37699 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 561773 | 0.016 |
1 | 40000 | 0.015 |
5 | 287428 | 0.014 |
1 | 76920 | 0.013 |
3 | 329990 | 0.012 |
Price($) | Vol. | No. |
---|---|---|
0.017 | 37699 | 2 |
0.019 | 277777 | 1 |
0.020 | 75063 | 2 |
0.021 | 193311 | 2 |
0.022 | 42431 | 2 |
Last trade - 07.03am 04/11/2024 (20 minute delay) ? |
SRI (ASX) Chart |
Day chart unavailable