BMN 5.02% $2.27 bannerman energy ltd

i forgot to calculate ramps and possible switch back's, 20 - 25...

  1. 2,019 Posts.
    i forgot to calculate ramps and possible switch back's, 20 - 25 meter width for Cat 789B 200 tonne trucks, not a big deal when cosidering the 100 meters i left for the pit foor, a huge pit floor would usually be designed for the mine to go underground through a port hole and have work space at the bottom and allow plenty of saftey, rock falls, ETC. Open cut then under ground is a very common practice to access very deep ore body's as open cut mining becomes less eficient at a certain depth, sometimes operation's run both at the same time.
 
watchlist Created with Sketch. Add BMN (ASX) to my watchlist
(20min delay)
Last
$2.27
Change
-0.120(5.02%)
Mkt cap ! $405.4M
Open High Low Value Volume
$2.41 $2.44 $2.23 $820.9K 356.5K

Buyers (Bids)

No. Vol. Price($)
5 10039 $2.26
 

Sellers (Offers)

Price($) Vol. No.
$2.27 2203 2
View Market Depth
Last trade - 16.10pm 13/09/2024 (20 minute delay) ?
BMN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.