it would be on the lower production curve I guess, on the
phase 3 to 105,000 mts per annum I calc aud 3 per share
if those costs is in line as per prospectus
the ferro aq would add to valuation, not much from memory
i think it was some aud 4 per annum, but if you would be
able to add a p/e it would look a whole lotta different.
should see a quarterly report out this week... if not a
receivership notice lol
we just need some sort of further info on the plant
production, that should be enough I reckon.
- Forums
- ASX - By Stock
- thanks
it would be on the lower production curve I guess, on the phase...
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)