I believe these are the 10 wells we are trying to jointly develop. ;)
Exploratory drillings in the area took place
between Mt. Sibayak and Mt. Pratektekan.
Pertamina drilled 10 wells in the Sibayak
field from 1991 to 1997, comprising 7
production wells (SBY-1, SBY-3, SBY-4,
SBY-5, SBY-6, SBY-7 and SBY-8) and 3
reinjection wells (SBY-2, SBY-9 and
SBY-10). The reservoir temperature
ranges between 240 and 300°C, and
pressure varies between 45 and 110 bar-g.
Most of the wells are non artesian with
pressure at the wellhead in shut-off
conditions. The enthalpy of the reservoir
reaches 1100 kJ/kg and the maximum
wellhead pressure is 21 bar-g in flowing
conditions. Steamflow from the
production well achieves 51.4 kg/s at 9 bar
pressure
At present in the Sibayak geothermal field,
a 2 MWe mono-block turbine is installed
to produce electricity with steam supplied
from well SBY-5. Pertamina is committed to expand the capacity by replacing the 2 MWe monoblock
turbine with a 10 MWe condensing turbine. This paper will briefly describe how the electrical
power generation can be maximized in the Sibayak geothermal field by using wells SBY-3, SBY-4,
SBY-5, SBY-6 and SBY-8 as production wells to supply steam to the power plant.
7 production 3 injection. proven current reserves of 39mwe and resource estimated to be as high as 170mwe
T = down-hole temperature in oC and O = well output in ton/hr
SBY-1
T=243, O=18
SBY-2
T=104, O=?
SBY-3
T=272, O=26
SBY-4
T=272, O=23
SBY-5
T=284, O=57
SBY-6
T=270, O=33
SBY-7
T=266, O=20
SBY-8
T=270, O=35
SBY-9
T=236, O=?
SBY-10
T=170, O=?