Hundreds of giant windmill blades are being shipped to a...

  1. 27,204 Posts.
    lightbulb Created with Sketch. 467

    THE RENEWABLE GREEN ENERGY MYTH: 50,000 Tons Of Non-Recyclable Wind Turbine Blades Dumped In The Landfill

    10.1.2020

    Funny, no one seemed to consider what to do with the massive amount of wind turbine blades once they reached the end of their lifespan. Thus, the irony of the present-day Green Energy Movement is the dumping of thousands of tons of "non-recyclable" supposedly renewable wind turbine blades in the country's landfills.

    Who would have thought? What's even worse, is that the amount of wind turbine blades slated for waste disposal is forecasted to quadruple over the next fifteen years as a great deal more blades reach their 15-20 year lifespan. Furthermore, the size and length of the newly installed wind turbine blades are now twice as large as they were 20-30 years ago.

    (graphic courtesy of Ahlstrom-Munksjo.com)

    Honestly, I hadn't considered the tremendous amount of waste generated by the so-called "Renewable" wind power industry until a long-term reader sent me the link to the following article, Landfill begins burying non-recyclable Wind Turbine Blades:

    Hundreds of giant windmill blades are being shipped to a landfill in Wyoming to be buried because they simply can’t be recycled. Local media reports several wind farms in the state are sending over 900 un-reusable blades to the Casper Regional Landfill to be buried. While nearly 90 percent of old or decommissioned wind turbines, like the motor housing, can be refurbished or at least crushed, fiberglass windmill blades present a problem due to their size and strength.

    “Our crushing equipment is not big enough to crush them,” a landfill representative told NPR.

    Prior to burying the cumbersome, sometimes nearly 300-foot long blades, the landfill has to cut them up into smaller pieces onsite and stack them in order to save space during transportation.


    Hundreds of giant windmill blades are being shipped to a landfill in Wyoming to be buried because they simply can’t be recycled. Local media reports several wind farms in the state are sending over 900 un-reusable blades to the Casper Regional Landfill to be buried. While nearly 90 percent of old or decommissioned wind turbines, like the motor housing, can be refurbished or at least crushed, fiberglass windmill blades present a problem due to their size and strength.

    “Our crushing equipment is not big enough to crush them,” a landfill representative told NPR.

    Prior to burying the cumbersome, sometimes nearly 300-foot long blades, the landfill has to cut them up into smaller pieces onsite and stack them in order to save space during transportation.



    All of it:

    https://www.zerohedge.com/news/2020-01-10/renewable-green-energy-myth-50000-tons-non-recyclable-wind-turbine-blades-dumped
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.