E25 element 25 limited

The Dawn of EV, page-1546

  1. 314 Posts.
    lightbulb Created with Sketch. 148
    At risk of sounding like rock man, this is excessively blue sky thinking. For the record I am still incredibly bullish on E25 HPMSM business but don't think every aspect of their business needs to be viewed with the rose tinted glasses.

    E25 cannot even run a super quad (60m quad config with net weight ~150t), they're currently using 115t net weight standard quad.
    This is under MRWA performance based standard if you want to do some reading / view allowable routes
    HVS Network Map - Mainroads WA

    I also believe MRL may be overselling the 'automation' side of things. My understanding was they are only allowed to travel in a convoy of 3 trucks, manned at the front and manned at the back with the middle truck fully automated. Maybe the drivers of the escort aren't 'driving' as such but there's only a 1/3 reduction in labour requirement. 320t on a public road seems unlikely, so they are either committing to a maintenance schedule that likely offsets the benefit or they are doing it on a predominantly private road (again maintenance or construction of that road wouldn't be cheap which isn't considered in their 50% haulage saving) with the last mile of that potentially on public road (would have to be agreed by MRWA)

    Source:
    "We will also build, own and operate all project infrastructure including a private, 150-kilometre haul road, port infrastructure, transhipper wharfs and two Onslow Resorts which will accommodate the project’s workforce," the statement added. Mineral Resources confirms FID for Onslow Iron project in WA | Mining Digital

    Ashburton would also be able to electrify their fleet on a 150km haul more simply, for E25 to do it on a 500km haul would be a huge challenge given the battery range for heavy haulage (they could get about half way and add in a battery swap to achieve this but that adds time and cost).

    Not saying any of this is impossible, but the logistics for Ashburton project v Butcherbird are much different prospects and it's important to understand the challenges.

    On the flip side, I believe E25 have an incredible advantage in their resource - low impurity ore that can be made into HPMSM without requiring electrolysis. This is the gamechanger.
    Last edited by Lockyg101: 15/10/22
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
24.0¢
Change
0.000(0.00%)
Mkt cap ! $54.86M
Open High Low Value Volume
24.0¢ 24.0¢ 22.5¢ $43.78K 184.4K

Buyers (Bids)

No. Vol. Price($)
3 1666 23.5¢
 

Sellers (Offers)

Price($) Vol. No.
24.0¢ 372711 1
View Market Depth
Last trade - 16.10pm 20/06/2025 (20 minute delay) ?
E25 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.