In the Chairmans address he stated "additional production equipment have been mobilised. The favourable weather and extra equipment should keep things on track.
You make an interesting point about the grade. In the 2010 annual report it states "The operating conditions at site are subject to heavy rain and potential flooding. The selection of 6WD articulated trucks will match the operating environment and allows the pit ramp gradient to be steepened to 1 in 8 extending to a maximum depth of 215 metres below surface." While operating environment won't change over the long term, the design depth of the pit has been reduced to 180 metres below surface. The 1 in 8 grade is no longer necessary reducing the need for 6WD trucks. It could give them more flexibility with equipment.
- Forums
- ASX - By Stock
- RED
- The Demise of RED5
The Demise of RED5, page-18
-
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RED (ASX) to my watchlist
(20min delay)
|
|||||
Last
34.0¢ |
Change
0.020(6.25%) |
Mkt cap ! $2.261B |
Open | High | Low | Value | Volume |
32.0¢ | 34.0¢ | 32.0¢ | $18.91M | 56.83M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 567280 | 33.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
34.0¢ | 9590957 | 39 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
6 | 4737214 | 0.370 |
25 | 528327 | 0.365 |
9 | 3191372 | 0.360 |
3 | 19690 | 0.355 |
13 | 6149233 | 0.350 |
Price($) | Vol. | No. |
---|---|---|
0.205 | 1030586 | 2 |
0.300 | 357891 | 1 |
0.305 | 59948 | 2 |
0.310 | 1090515 | 12 |
0.320 | 4785210 | 24 |
Last trade - 16.10pm 30/08/2024 (20 minute delay) ? |
Featured News
RED (ASX) Chart |
The Watchlist
1CG
ONE CLICK GROUP LIMITED
Mark Waller, MD
Mark Waller
MD
Previous Video
Next Video
SPONSORED BY The Market Online