Next resource estimate calculation on track for the second quarter CY2012 will incorporate all drilling results.
? Definitive Feasibility Studies based on a 3.5mtpa operation for 200,000oz gold on track for delivery in the third quarter CY2012.
? It is anticipated that the shallow nature of these drill results will be significant in the “starter pit” designs of the Definitive Feasibility Studies.
? A total of eight drill rigs currently turning at the Banfora Gold Project with further results from Nogbele, Samavogo, Stinger and satellite targets expected shortly.
- Forums
- ASX - By Stock
- GRY
- the driving force forward will be
the driving force forward will be
-
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)