Hi PJMAC Sorry for taking so long to get back to your knowledgeable reply but I was in a meeting doing my day job as a mining project engineer regarding the start up and commissioning of a major gold plant expansion in West Africa which goes along with my previous experience of design , construct , commission and rampup of Goro, Raventhorpe and Murrin Murrin nickel laterie plants (ah same as what AUZ are going to build). But yes a Resource scoping study has been carried out but no Reserve study has not been done ,see below from Annual Report Pg 33 date 30Jun2017
(ii) activities in the area of interest have not at the reporting date, reached a stage which permits a reasonable assessment of the existence or other wise of economically recoverable reserves and active and significant operations in, or in relation to, the area of interest are continuing
DYOR Champ
- Forums
- ASX - By Stock
- The Drop
Hi PJMAC Sorry for taking so long to get back to your...
-
- There are more pages in this discussion • 55 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AUZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $11.18M |
Open | High | Low | Value | Volume |
0.8¢ | 0.9¢ | 0.7¢ | $118.5K | 14.82M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
29 | 18325255 | 0.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.8¢ | 3470282 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
29 | 18325255 | 0.007 |
18 | 11419558 | 0.006 |
10 | 6010000 | 0.005 |
7 | 5480000 | 0.004 |
4 | 4400001 | 0.003 |
Price($) | Vol. | No. |
---|---|---|
0.008 | 3470282 | 5 |
0.009 | 3119426 | 13 |
0.010 | 5129370 | 26 |
0.011 | 5461784 | 19 |
0.012 | 5415576 | 9 |
Last trade - 16.10pm 05/08/2024 (20 minute delay) ? |
Featured News
AUZ (ASX) Chart |