I reckon 12-24 hrs for anchor running.
Then they've got to build the BHA, so put 6 hours there.
Trip down to seabed and start spudding. Lets say they go about 100m for the conductor, 1-5 hrs.
pull out of hole 2-3 hours.
Switch over to casing elevators 1-2 hrs. Trip in with casing- 5 hours.
Rig up Cement unit 1-2 hrs.
Pump Cement 1-2 hrs.
Switch to Pipe running Elevators - 1-2 hrs.
Tension conductor 2 hours.
Build next BHA - 6 hrs
Run in Hole - 3 hours
Drill through casing shoe- 0.5hrs - 2 hrs ( I was once on a rig where this took 6 hours because the float collar had gotten stuck on the bit and was just spinning).
Drill to 1000m - 10-40 hours
So possibly around 4-5 days from getting on site to being at 1000m, and this would be pretty quick I think.
- Forums
- ASX - By Stock
- the eagle has landed.
I reckon 12-24 hrs for anchor running.Then they've got to build...
-
- There are more pages in this discussion • 24 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KAR (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.38 |
Change
0.000(0.00%) |
Mkt cap ! $1.075B |
Open | High | Low | Value | Volume |
$1.37 | $1.39 | $1.33 | $11.11M | 8.183M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 35188 | $1.38 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.39 | 56395 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 35188 | 1.380 |
2 | 8999 | 1.375 |
7 | 186388 | 1.370 |
4 | 51018 | 1.365 |
3 | 12448 | 1.360 |
Price($) | Vol. | No. |
---|---|---|
1.385 | 56395 | 7 |
1.390 | 42500 | 4 |
1.395 | 77363 | 2 |
1.400 | 26596 | 4 |
1.405 | 25286 | 2 |
Last trade - 16.10pm 28/10/2024 (20 minute delay) ? |
Featured News
KAR (ASX) Chart |