I reckon 12-24 hrs for anchor running.
Then they've got to build the BHA, so put 6 hours there.
Trip down to seabed and start spudding. Lets say they go about 100m for the conductor, 1-5 hrs.
pull out of hole 2-3 hours.
Switch over to casing elevators 1-2 hrs. Trip in with casing- 5 hours.
Rig up Cement unit 1-2 hrs.
Pump Cement 1-2 hrs.
Switch to Pipe running Elevators - 1-2 hrs.
Tension conductor 2 hours.
Build next BHA - 6 hrs
Run in Hole - 3 hours
Drill through casing shoe- 0.5hrs - 2 hrs ( I was once on a rig where this took 6 hours because the float collar had gotten stuck on the bit and was just spinning).
Drill to 1000m - 10-40 hours
So possibly around 4-5 days from getting on site to being at 1000m, and this would be pretty quick I think.
- Forums
- ASX - By Stock
- the eagle has landed.
I reckon 12-24 hrs for anchor running.Then they've got to build...
-
- There are more pages in this discussion • 24 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KAR (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.65 |
Change
0.035(2.17%) |
Mkt cap ! $1.281B |
Open | High | Low | Value | Volume |
$1.68 | $1.69 | $1.63 | $12.23M | 7.389M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
8 | 228084 | $1.64 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.65 | 78806 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
8 | 228084 | 1.640 |
2 | 34853 | 1.635 |
6 | 40122 | 1.630 |
3 | 7458 | 1.625 |
8 | 23846 | 1.620 |
Price($) | Vol. | No. |
---|---|---|
1.645 | 78806 | 2 |
1.650 | 68235 | 3 |
1.655 | 68660 | 4 |
1.660 | 6104 | 1 |
1.665 | 6104 | 1 |
Last trade - 16.10pm 04/10/2024 (20 minute delay) ? |
Featured News
KAR (ASX) Chart |