VOR 0.00% 39.5¢ vortiv limited

I previously wrote; Every 500 ATM contract requires...

  1. 11,065 Posts.
    lightbulb Created with Sketch. 1331
    I previously wrote;

    Every 500 ATM contract requires approximately $10M in CAPEX.

    I'd like to correct that with...

    A typical 500 ATM contract will require expenditure of ~$10M in CAPEX alone.

    This was highlighted on page 11 of the 2013 Shareholder Presentation.

    http://www.asx.com.au/asxpdf/20130521/pdf/42g0djsf3szvh1.pdf

    Tony
 
watchlist Created with Sketch. Add VOR (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.