So as @ May 21 first up FCOT was stated by Nigel as....... :
January 2023
then - it shifted to........:
Q1 2023
Now the latest tweet states..... :
March 2023 (for SC6)
as that is a clear timeline slip (since May 2021), is the mine construction (proper - not just grading ROM pads)
of August 2021 (next month) under pressure of slipping.
If it is, to be fair I'll use the same slip as FCOT - 2 months...
In order to make March 2023 SC6 production then the whole mine construction, commissioning, hitting initial nameplate output etc.....
This means all construction will have 16 months for completion.
Is that likely?
Is that realistically achievable?
Is maintaining the near impossible best governance by the BoD for the "worlds largest hard rock lithium deposit"?
- Forums
- ASX - By Stock
- The Future?
So as @ May 21 first up FCOT was stated by Nigel as..........
-
-
- There are more pages in this discussion • 150 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AVZ (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
CCO
THE CALMER CO INTERNATIONAL LIMITED
Anthony Noble, CEO
Anthony Noble
CEO
SPONSORED BY The Market Online