PAX 0.00% 1.2¢ panax geothermal limited

Drilling depth targetted 4,000m but may be shallower depending...

  1. 1,912 Posts.
    Drilling depth targetted 4,000m but may be shallower depending on results.

    Spudded in the evening of 31 Jan
    Drilling to 9 Feb (= now 9 days of 24 hour drilling?).
    Drilled and cased 24in section to 500m
    Now drilling 17.5in section to 1184m.

    Simple linear extrapolation: 1184/9 = 131.55m per day = around 30 days to full target depth?

    From memory PTR started off with low 30's m per day.

    Interested to hear your thoughts Juke. While to a non-engineer like myself, a smaller diameter should mean a faster rate, I believe you previously made the comment that the rate normally slows at further depth???

    Looks like they're setting a cracking pace to me.
 
watchlist Created with Sketch. Add PAX (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.