Yes mate, the original London Flats #1 was drilled with the best data available at the time but missed everything. This result is a great example of the significant difference 3D survey makes in well location. Actually, after the 2011 3D survey was analysed, Terry submitted and received approval ( 12-4-2011 } for a re-entry of London Flats on a different axis to the original drill in order to align with the fracture swarms identified on the 3D.
OMR
SSN Price at posting:
9.7¢ Sentiment: LT Buy Disclosure: Held